Well, I hope the drought wont recur.
Caught up with work for the couple of months previously. The replacement didnt really perform as expected. She tried, but she could only take the easy application. For application that needs scripting or custom action (majority of the app), she had to pass it to me.
Cant blame her much. This is seriously not an level entry job. You need to know at least how to tweak the windows registries (HKLM, HKCU, HKU), some knowledge in batch files programming and VBScript and a good imagination (you need to foresee this function would do what in an application). Granted we only repackage whatever vendor gave to us, but most of the times vendor app is not enough to make work in EM environment.
BTW, for those who had no idea what i wrote above my job simply: Got the app from vendor --> Repackage it to our standard --> Make available to users in add/remove program. Example, we got Adobe Photoshop from vendor, we re-engineer the app i.e remove whatever functions not needed, add our controls, etc and we give it to our users.
On top of that, there's this lab restacking activities. And because I was the only male around, automatically responsibility the fell on me. Pretty pissed, but no point of complaining. Just do it.. save the headache and heartache.
Before:================Instead of moving 4 pcs to the left, the bitch who did the planning wanted to move everything to the right. Tried to reason with her, but she's not having any of it.. citing about she's more experienced than I was and it was her project. She's aiming for supervisory position next year, and wont let lower ranked person like me to become a hindrance.


During:================So, i alone had to move more than 15 pcs to the right side, unwired and rewired. Reconfigured KVMs and Network (Cisco routers) and relabeling.

After:================

Oh and its not done though... Next monday, 100 new desktops/laptops are coming with 6 additional racks. The idiot want to put the rack next to the wall, blocking the hot air from being ventilated. Moreover, the wall is from the cardboard. and the floor wasnt enforced as in the 7th floor server room. Dont know how it could hold 100 machines in 6 racks in such a small space!
================Thats one of the reason I was away from blogging, although deep inside I was raging mad...